Chapter 9: Network Flow and Critical Path Analysis Notes

Turning an activity chart into a network with dummy activities, forward and backward scanning, float, critical paths and Gantt charts, then flow networks, cuts and the maximum-flow minimum-cut theorem.

Sections

  1. 9A Activity charts and network diagrams Mastered

    Reading an activity chart (precedence table), immediate predecessors, drawing an activity-on-arc network, and using a dummy activity when two activities share some but not all of their predecessors.

  2. 9B Forward and backward scanning Mastered

    Earliest starting times (EST) by forward scanning, the minimum completion time, and latest starting times (LST) by backward scanning, with the largest-in, smallest-out rules.

  3. 9C Float, critical paths and Gantt charts Mastered

    Float time for each activity, critical activities and the critical path, the effect of changing a duration, drawing a Gantt chart from a network, and a spreadsheet model of a project.

  4. 9D Flow networks and maximum flow Mastered

    The language of flow networks (source, sink, capacity, flow), drawing a network from a table, the rules every flow must obey, and finding the maximum flow by sending flow along paths.

  5. 9E Cuts and the max-flow min-cut theorem Mastered

    Cuts in a flow network, finding the capacity of a cut (forward edges only), the maximum-flow minimum-cut theorem, and using it to judge upgrades and whether a network can meet demand.

Formula sheet